Integration Connector Status Values

When an integration is run to stream data into Oomnitza, the health of the data collection is clearly indicated by the color of the integration tile.

To check the status of your integrations, click Settings.

Green integration bar at the bottom of the tile. Integration tile with green bar

The last five runs to stream data into Oomnitza completed successfully.

 integration bar at the bottom of the tile. Integration tile with yellow bar

The last two out of the five runs to stream data into Oomnitza completed successfully. One or more of the last five runs failed.

Orange integration bar at the bottom of the tile. Integration tile with orange bar

The run was paused. Applies to extended connector integrations only. 

Grey  integration bar at the bottom of the tile. Integration tile with grey bar

For extended connector integrations, the streaming of data into Oomnitza has been disabled. 

For basic connector integrations, data hasn't been streamed into Oomnitza for 30 days. 

red-integration-tile.svg  Integration tile with red bar

One of the last two runs to stream data into Oomnitza failed or completed with errors.

Troubleshooting tip
Having issues with streaming data into Oomnitza? Check the logs for the most recent runs. See How to access error logs.

Related links

blue_link.svg Connector FAQs

blue_link.svg Extended connectors

 

 

Have more questions? Submit a request

0 Comments

Please sign in to leave a comment.
Powered by Zendesk