When an integration is run to stream data into Oomnitza, the health of the data collection is clearly indicated by the color of the integration tile.
To check the status of your integrations, click Settings.
Integration tile with green bar
The last five runs to stream data into Oomnitza completed successfully.
Integration tile with yellow bar
The last two out of the five runs to stream data into Oomnitza completed successfully. One or more of the last five runs failed.
Integration tile with orange bar
The run was paused. Applies to extended connector integrations only.
Integration tile with grey bar
For extended connector integrations, the streaming of data into Oomnitza has been disabled.
For basic connector integrations, data hasn't been streamed into Oomnitza for 30 days.
Integration tile with red bar
One of the last two runs to stream data into Oomnitza failed or completed with errors.
Troubleshooting tip
Having issues with streaming data into Oomnitza? Check the logs for the most recent runs. See How to access error logs.
Related links
Comments
0 comments
Please sign in to leave a comment.